Project overview
Location
India
Capacity
40.1 MW
Project size
951,011 m²
Footnotes
1 SolarArise estimates for 2023. Avoided emissions are calculated in line with the International Financial Institutions Technical Working Group on GHG Accounting Methodology for GHG Accounting for Grid Connected Renewable Energy Projects, using the 2022 Harmonized Combined Margin Grid Factor for Intermittent Energy in India (0.822).
2 The investments that are made must always make a positive social contribution, whether direct or indirect. Investments in infrastructure for renewable energy production are direct investments by the ThomasLloyd Group. This means that the infrastructure facilities are built and operated directly. For this purpose, employees are hired during the construction phase of the projects and employees are directly recruited for the operation of the projects. The values shown show the total number of employees (construction phase and operation phase). Project development can also always contribute indirectly to the development of employment in a region.
2 The investments that are made must always make a positive social contribution, whether direct or indirect. Investments in infrastructure for renewable energy production are direct investments by the ThomasLloyd Group. This means that the infrastructure facilities are built and operated directly. For this purpose, employees are hired during the construction phase of the projects and employees are directly recruited for the operation of the projects. The values shown show the total number of employees (construction phase and operation phase). Project development can also always contribute indirectly to the development of employment in a region.